• mctoasterson@reddthat.com
    link
    fedilink
    English
    arrow-up
    86
    arrow-down
    7
    ·
    1 day ago

    To be fair, this federal program was a cluster eff since they started it in about 2010. It passed a bunch of grant money through to the states, which all did different “things” with it. Most held semi-public meetings and planning sessions for 5-10 years or wrote detailed planning documents but never delivered any physical infrastructure (actual results to the residents).

    • Landless2029@lemmy.world
      link
      fedilink
      English
      arrow-up
      62
      ·
      1 day ago

      Some states / towns hired ISPs who just pocketed the money with no consequences. Some towns even got fed up with no progress and started their own ISPs only to get sued by said corrupt ISP. Looking at you Verizon FiOS.

    • Buelldozer@lemmy.today
      link
      fedilink
      English
      arrow-up
      24
      ·
      24 hours ago

      I’m confused. The article is talking about “BEAD” which wasn’t passed until 2021. You must be talking about a different program.

      • madcaesar@lemmy.world
        link
        fedilink
        English
        arrow-up
        4
        ·
        7 hours ago

        Yea he is, but it’s probably the same telecom handout bullshit like the other program.

        Trump is a piece of shit, but every program he cuts is not necessarily wrong. Even a broken clock is right twice a day.

    • turmacar@lemmy.world
      link
      fedilink
      English
      arrow-up
      12
      arrow-down
      1
      ·
      edit-2
      1 day ago

      I’m sure that there are examples of actually wasted money, but just putting it out there that planning is fucking important. There have been several high profile projects, like Texas high speed rail, where planning was the hard part and the project got canceled as they were ready to break ground because “there was no progress”. Cue* Republicans “the government does nothing” after they stopped anything from happening. Infrastructure cannot operate on election cycle timelines.

      Digging in the ground and integrating with existing infrastructure isn’t just a plug and play operation. Leases and liens need to be sorted out. Estimates of current and future demand needs to be sorted out so you don’t install useless networks. Fiber isn’t that heavy, but “can the existing conduits under bridges/roads/etc support it and/or do they have room to without a complete replacement” isn’t a trivial question for backbone lines.

      Winging it just causes more problems as you find things you didn’t anticipate and cause delays while having to continue paying contracts so work can resume once the delay is cleared. If you don’t, the contractor is on to their next job and unavailable for an effectively random amount of time. While everyone is mad at you that “no work is being done”.

      It could be done faster, but it would cost more. Because planning is really important to keep multi-million/billion dollar projects accountable and on track.

      • Buelldozer@lemmy.today
        link
        fedilink
        English
        arrow-up
        4
        ·
        24 hours ago

        I’m in Wyoming and fiber started rolling out in multiple cities with multiple different providers in each city two years ago. They got to my house earlier this year so I now have a 2Gb/s connection.

    • BrianTheeBiscuiteer@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 day ago

      Most of this money was also “allocated” but not really spent. So at least to Bidens credit money wasn’t thrown away, it just sat there not doing what it was supposed to do.