• Thebeardedsinglemalt@lemmy.world
    link
    fedilink
    arrow-up
    26
    ·
    edit-2
    18 hours ago

    Pace yourself, because if you only ever worked at maximum capacity then they’d always expect maximum capacity. Always work at cruising speeds so when you need to go max speed you look like a miracle worker

    • lightnsfw@reddthat.com
      link
      fedilink
      arrow-up
      18
      ·
      1 day ago

      When I was a supervisor I used to tell people on my team that. I didn’t want them going above and beyond to make shit happen when we were short staffed because then the bean counters were gonna see that and determine we didn’t need more people. I told them they should shoot to get “exceeds” on their metrics but nothing beyond that because that was all that was needed to max out their performance review at the end of the year.